Roofing services
Residential and commercial roofing across Hattiesburg and the Pine Belt. Every job starts with a free, honest inspection.
- 1Decking. Tear-off to the deck, rotted decking repaired.
- 2Underlayment. The water barrier under everything.
- 3Flashing. Drip edge, chimney, pipe boots.
- 4Shingles. Laid from the eave up.
- 5Ridge vent and caps. On last.
DrawingSection through a TopCo roof
Emergency roofing24/7 on 601-543-4687
| Service | For | What it covers | Time |
|---|---|---|---|
| Homes | |||
| Roof replacement | Homes with storm damage or an aging roof | Tear-off to the deck, decking repaired where storm damage caused rot, new underlayment, flashing, shingles, ridge vents and pipe boots, then a full cleanup. | Within a week of claim approval, installed in a day |
| Roof repair | Leaks, missing shingles, storm damage | An honest assessment first, emergency tarping when it is needed, then a permanent repair to the root cause with a written workmanship warranty. | Most repairs take 1 to 2 days |
| New construction | New homes and their builders | Shingle, metal and cedar roofs installed to manufacturer specifications, scheduled with your builder and the other trades. | 1 to 2 days on most homes |
| Commercial buildings | |||
| Roof systems | Flat and low-slope buildings | TPO, EPDM, PVC, modified bitumen and built-up systems, matched to how the building is used. | Assessment in 60 to 90 minutes |
| Replacement | Roofs past repair | Complete tear-off and a new system, with permits, inspections and phasing handled for occupied buildings. | 1 to 2 weeks for a small office, 3 to 6 for a large church or clinic |
| Repair and leak detection | Active leaks and damage | The whole roof checked for the real source, then repairs around your hours, water-tested where possible. | Inspection in 30 to 60 minutes |
| Inspections | Maintenance, warranties, sales, storms | The membrane, seams, drainage, flashing and equipment checked, photographed and reported with priorities. | Report in 2 to 3 business days |
| Coatings | Sound roofs that need more life | Silicone, acrylic or polyurethane coating after a full clean and repair, applied at the manufacturer thickness. | 2 to 5 days on most buildings |
| Programs | |||
| Roof Relief System | Insurance claims | Assess, advocate, accelerate, deliver: the inspection, the claim, the adjuster visit and the install, with us beside you. | One week from approval |
| No Roof Left Behind | Families who cannot cover a roof | Insurance, financing with and without credit checks including zero-interest plans, or a custom payment plan. | Starts with a free assessment |
Commercial roofs, in section
A low-slope roof has its own layers: a deck, insulation sloped to the drains, a membrane, flashing at every edge and curb, and often a coating.
- ASteel deck on open-web joists.
- BTapered insulation, sloped to the drain.
- CParapet flashing and counter flashing.
- DSingle-ply membrane with a heat-welded lap.
- ECurb flashing at a rooftop unit.
Not sure what your roof needs?
Start with a free inspection. We tell you what it needs, even when the answer is nothing.